1300 857 628

Major Project Snapshot

We’re incredibly proud of our major project experience.

Thomas Kingsley Resources is widely regarded as a civil and commercial earthmover – our systems and processes support larger projects with stringent safety, compliance and productivity expectations. We are proud to have been a part of almost every major civil construction project in South East Queensland in the last 10 years, and we are the go-to supplier for the civil construction industry – because we understand what it takes to provide productive, reliable and highly skilled services to projects that focus on productivity and timely delivery with precision and cost efficiency.

Below is a snapshot of the large scale projects where Thomas Kingsley Heavy Equipment has been critical to successful project delivery.

Logan Enhancement Project (LEP) Brisbane

Client – CPB Contractors

Commencement Year – 2017

Overview – Queensland’s $512 million Logan Enhancement Project includes upgrading parts of the Logan and Gateway Extension motorways, improving key congestion hot spots (Mt Lindesay Highway/Beaudesert Road interchange and the Wembley Road/Logan Motorway interchange) and constructing new south-facing ramps at Compton Road. Specialist services included detailed rock saw cutting for bridge footing in rock reducing the requirement for concrete formwork as well as bulk rock excavation utilising 50t excavator and Atlas Copco hydraulic rock breaker. TKR has also supported the project on programmed weekend shutdown works which run 48hrs straight providing additional man power, equipment and logistics for these critical works.

Kingsford Smith Drive Upgrade, Brisbane

Client – Lendlease

Commencement Year – 2016

Overview – The Kingsford Smith Drive upgrade involves the road widening from four to six lanes between from Eagle Farm to Hamilton. Recognised for the ability to provide and in some cases engineer diverse range of machinery and attachments, TKR Heavy Equipment supplying a variety of machines to both earthworks, marine and structures components of the project. Early engagement of TKRs service providing machines from 1.8T Excavators to 50T long reach barge mounted excavators. Specialist attachments included – underwater hydraulic rock breakers, under water hydraulic headers/pineapple profiler attachment with GPS, mud probe, gabion basket frames with power tilt hitches and custom TOPCON GPS positioning system to ensure accurate allignment of baskets over water.

Gateway Upgrade North Stage 2, Brisbane

Client – Lendlease

Commencement Year – 2016

Overview – The upgrade of the Gateway Motorway between Nudgee and Deagon from four to six lanes including various upgrades of bridges, interchanges and merges, with capacity for future expansion to eight lanes. TKR Heavy Equipment provided services based on a wet hire arrangement working with structures, bulk earthworks and drainage crews suppling.

Wulkaraka, QLD Rail

Client – Laing Orourke

Commencement Year – 2016

Overview – The upgrade of the QLD Rail Stabling yard and including new road, carpark, drainage and detailed earthworks at the QR Wulkarak rail depot. TKR Heavy Equipment provided services based on a wet hire arrangement working with pavements, structures, bulk earthworks and drainage crews.

Tintenbar to Ewingsdale, NSW

Client – Lendlease

Commencement Year – 2013

Overview – The Tintenbar to Ewingsdale section of the Pacific Highway upgrade is about 17 kilometres in length starting at the northern end of the Ballina bypass and ending at the Ewingsdale interchange. Originally engaged by Baulderstone Hornibrook before being purchased by Lendlease. TKR provided services of both wet hire and dry hire plant on both surface and underground/ tunnelling operations which included detailed earthworks utilizing Diamond Tip Rock Saws, Hydraulic Hammers, Hydraulic Headers and conventional excavation methods.

Reedy Creek, QLD

Client – Leighton

Commencement Year – 2012

Overview – As part of Australian Pacific Natural Gas (APLNG) expansion of their natural gas assets within the Surat Basin, TKR were engaged through Leighton Contractors to provide both wet hire and dry hire solutions for bulk and detailed earthworks operations. The bulk earthworks consisted a fleet of 637G scrapers, D10T, 825H, 16M and 2 x 40KL ADT water trucks.

The bulk earthworks fleet was closely followed by the TKR team of detailed earthworks crew completing drainage, roadways and footings for structures.

APLNG Combabula

Client – BMD Constructions

Commencement Year – 2013

Overview – As part of Australian Pacific Natural Gas (APLNG) expansion of their natural gas assets within the Surat Basin TKR were engaged through BMD Contractors to provide both wet hire and dry hire solutions for bulk and detailed earthworks operations.

The bulk earthworks fleet was closely followed by the TKR team of detailed earthworks crew completing sewer, drainage, roadways and footings for structures.

Other major projects TKR Heavy Equipment have been involved in

Project Name

NDRAA RAAF Amberly

Project Type

Civil Earthworks

Client

BMD Constructions

Project Name

Yarwun Red Mud Dam

Project Type

Tailings Dam Lift

Client

NRW Holdings

Project Name

Hotel Taxiway Bris Airport

Project Type

Airport Taxiway Construction

Client

BMD Constructions

Project Name

Brisbane Airport

Project Type

Northern Apron Expansion

Client

BMD Constructions

Project Name

Inner City Bypass

Project Type

Road Widening

Client

BMD Constructions

Project Name

CR2SM

Project Type

Bruce Highway upgrade

Client

Fulton Hogan Seymour Whyte

Project Name

Gold Coast Light Rail

Project Type

Light Rail Construction

Client

MacDow and CPB

Project Name

Toll Logistisc – Roma

Project Type

APLNG

Client

Toll Holdings

Project Name

NSW Pacific Highway Upgrade

Project Type

Road Construction

Client

Golding Contractors

Project Name

Airport Link

Project Type

Tunnel for Urban Vehicle Transport

Client

Thiess John Holland

Project Name

Coal Connect

Project Type

Rail Construction

Client

Leighton Contractors

Project Name

Curtis Island

Project Type

Earthworks for Gas Storage Tanks

Client

Thiess

Project Name

Curtis Island

Project Type

Earthworks For Gas Processing plant

Client

Macmahon

Project Name

Brisbane Airport

Project Type

Taxiway extension

Client

Baulderstone

Residential / Subdivision

TKR is also a major supplier to the QLD South East subdivision market. Providing services both on wet and dry hire solutions. Some of the smaller projects consisting of only 20 lots all the way upto bulk earthworks, detailed drainage and pavement preparation on 1,000 lot subdivisions.

Current and existing projects range from regions within –

  • Brisbane
  • Gold Coast
  • Toowoomba
  • Ipswich
  • Sunshine Coast
  • Tweed Heads
  • Northern NSW

Contact us today for a

FREE QUOTE